Dangote 3X Cement (50kg)
₦9,200
per 50kg bag
Barrow reads your drawings, calculates exact quantities, and prices every item against live Nigerian depot rates. The whole thing takes minutes.
Manual measurement and stale rate sheets can cost contractors up to 14% in budget overruns before site work even starts.
| Category | Traditional | Barrow |
|---|---|---|
| Turnaround | 10–14 days per tender — senior QS engineers tracing scale rulers across printed floor plans. | 4 minutes. Upload drawings, get itemised quantities with wall areas, slab volumes, and reinforcement weights. |
| Pricing | Calling dealers one by one across Alaba, Dei-Dei, and Odunade with no way to compare prices. | Live depot rates pulled from across Nigeria. You see what materials cost right now, not last month. |
| Accuracy | Broken cell links, missed deductions, and rounding errors that have cost firms tender underbids. | All quantities calculated by formula. Click any figure to inspect the exact drawing coordinates and maths behind it. |
| Rate freshness | Bids on 4-week-old quotes get crushed by mid-project currency devaluations and haulage hikes. | When factory gate prices move, reprice your entire BEME in one click before submitting. |
Track verified retail and wholesale rates updated weekly across Nigeria.
₦9,200
per 50kg bag
₦1,420,000
per metric ton
₦1,410,000
per metric ton
₦145,000
per 20-ton tipper
₦280,000
per 20-ton tipper
Built for how Nigerian construction actually works, not adapted from a generic tool.
Upload your drawing as a PDF (up to 50MB) — architectural, structural, or MEP. Barrow reads floor plans, schedule sheets, and reinforcement layouts across every storey in seconds.
The AI pulls dimensions and schedule callouts directly from your drawings. All quantities are calculated by formula, so there are no invented or estimated numbers in your output.
Every measured item gets priced against verified Lagos and Abuja depot rates. Review confidence scores, adjust your markups, and export a BESMM4-compliant BEME as Excel or PDF with every formula visible.
Whether you're putting together a bid, writing up a bill of quantities, or checking a contractor's claims.
Tender 5× more projects without adding headcount.
Spend less time measuring and more on the work that needs judgment.
Check contractor quotes against what materials actually cost.
Nigeria’s leading contractors and developers are moving off spreadsheets. Cohort 1 is how you get in early.
Priority AI Calibration
Barrow learns your firm's drawing conventions and notation styles.
3 Months Benchmarks
Complimentary full access to material price database.
Cohort 1 members get early-adopter pricing locked for 24 months, a direct line into the product roadmap, and first access to the Nigerian Structural Reinforcement module.