Stop losing tender margins to manual takeoff delays.

Barrow reads your drawings, calculates exact quantities, and prices every item against live Nigerian depot rates. The whole thing takes minutes.

Explore Live Market Rates

Why construction leaders replace spreadsheets with Barrow.

Manual measurement and stale rate sheets can cost contractors up to 14% in budget overruns before site work even starts.

CategoryTraditionalBarrow
Turnaround10–14 days per tender — senior QS engineers tracing scale rulers across printed floor plans.4 minutes. Upload drawings, get itemised quantities with wall areas, slab volumes, and reinforcement weights.
PricingCalling dealers one by one across Alaba, Dei-Dei, and Odunade with no way to compare prices.Live depot rates pulled from across Nigeria. You see what materials cost right now, not last month.
AccuracyBroken cell links, missed deductions, and rounding errors that have cost firms tender underbids.All quantities calculated by formula. Click any figure to inspect the exact drawing coordinates and maths behind it.
Rate freshnessBids on 4-week-old quotes get crushed by mid-project currency devaluations and haulage hikes.When factory gate prices move, reprice your entire BEME in one click before submitting.

Live Nigerian benchmark prices.

Track verified retail and wholesale rates updated weekly across Nigeria.

Explore all benchmark prices

Dangote 3X Cement (50kg)

₦9,200

per 50kg bag

16mm High-Yield Rebar (Ton)

₦1,420,000

per metric ton

12mm High-Yield Rebar (Ton)

₦1,410,000

per metric ton

Sharp Sand (20-Ton Tipper)

₦145,000

per 20-ton tipper

Granite 19mm (20-Ton Tipper)

₦280,000

per 20-ton tipper

From drawing upload to costed BEME in three steps.

Built for how Nigerian construction actually works, not adapted from a generic tool.

01

Upload Your Drawings

Upload your drawing as a PDF (up to 50MB) — architectural, structural, or MEP. Barrow reads floor plans, schedule sheets, and reinforcement layouts across every storey in seconds.

02

AI Takeoff, No Guesswork

The AI pulls dimensions and schedule callouts directly from your drawings. All quantities are calculated by formula, so there are no invented or estimated numbers in your output.

03

Price & Export

Every measured item gets priced against verified Lagos and Abuja depot rates. Review confidence scores, adjust your markups, and export a BESMM4-compliant BEME as Excel or PDF with every formula visible.

For everyone pricing Nigerian construction.

Whether you're putting together a bid, writing up a bill of quantities, or checking a contractor's claims.

Commercial Contractors

Tender 5× more projects without adding headcount.

  • Submit auditable bids before your competitors finish theirs
  • Reprice in one click when rebar or cement spikes mid-project
  • Export tender-ready BEME sheets with every formula visible

Quantity Surveyors

Spend less time measuring and more on the work that needs judgment.

  • Cut takeoff cycles from 14 days to under 30 minutes
  • BESMM4-aligned descriptions and standard work breakdown codes
  • Every calculated quantity links back to the exact drawing coordinates

Property Developers

Check contractor quotes against what materials actually cost.

  • Stress-test contractor quotes against verified distributor price books
  • Catch over-measured quantities before releasing funds
  • Reduce variation disputes with quantities tied to exact drawing coordinates

Apply for Private Beta Access.

Nigeria’s leading contractors and developers are moving off spreadsheets. Cohort 1 is how you get in early.

Priority AI Calibration

Barrow learns your firm's drawing conventions and notation styles.

3 Months Benchmarks

Complimentary full access to material price database.

Explore Live Market Rates
Founding Cohort Allocation
100 SeatsStrictly Enforced

Cohort 1 members get early-adopter pricing locked for 24 months, a direct line into the product roadmap, and first access to the Nigerian Structural Reinforcement module.